May 31, 2018 / Fari Mahdavi
Category: Research Update 

New Research Reports May 2018

A listing of recently released research reports is provided below. Completed Reports are available on Energy Pipelines CRC website members area:

RP1-07: Cracking in Polyethylene and other Polymer Pipelines:

  • Milestone Report 1: Artificial ageing and the link to changes in mechanical properties of polyethylene materials.

RP2-12: Cathodic shielding under disbonded coating

  • Milestone Report 8: Report on the whole of laboratory and field experimental results on the evaluation of corrosion under disbonded coatings.

RP2-14: Pipeline condition monitoring sensors

  • Milestone Report 8: Report on the whole of laboratory and field experimental results of the Pipeline Condition Monitoring (PCM) system.

RP4-09: Increasing Regulatory Effectiveness

  • Final Report: Technical regulatory effectiveness

RP4-20B: Urban Planning for Pipelines

  • Milestone Report 1: Organisational structures for external interference management.

RP4-26: Economic and technical regulation

  • Final Report: The impact of economic regulation on long term safety outcomes

The following research reports are currently out for industry review:

RP2-13: Predicting pipeline failure through corrosion modelling

  • Final Report: Data storage, analysis software and web-based IT platform for pipe corrosion modelling.

RP6.2-04: Shore Crossing Cathodic Protection Test Program

  • Final report and Engineering Guidelines for the design and operation of cathodic protection (CP) systems at pipeline shoreline crossings.

RP6.2-05: High voltage holiday testing of dual layer FBE

  • Final Report: Data analysis and recommendations for AS 3862 associated with high voltage holiday testing of dual layer FBE.

RP3-11B: Characteristics of natural gas pipeline blowdowns in built-up (populated) areas- Study F

  • Milestone Report 7: Literature Review, Bethungra Blowdown and Noise Modelling.


Latest News

Subscribe to E-News
Thanks for Subscribing.
CEO's Update July 2018

CEO's Update July 2018

31-07-18

The highlight for this month was the 8th and final Energy Pipelines CRC Research Conference.

Final Research Conference Celebrates  Legacy and Achievements

Final Research Conference Celebrates Legacy and Achievements

31-07-18

The final Energy Pipelines CRC Research Conference was held from the 9th-10th July 2018 at Waurn Ponds Estate Geelong.

Seven New Projects To Commence

Seven New Projects To Commence

31-07-18

Project information is available on the Energy Pipelines CRC Website Members' Area.

APGA/ACA Pipeline Corrosion  Management Technical Seminar

APGA/ACA Pipeline Corrosion Management Technical Seminar

31-07-18

The joint APGA/ACA Technical Conference was well attended with many informative sessions.